Posts Tagged Excavation

Willisville Force Main Extension

Willisville Force Main Extension

Willisville Force Main Extension Bushong Contracting was contracted by Loudoun Water to install a sanitary sewer force main.  The project required branching off of an existing main with a smaller trunk line in order to install/connect 3 grinder pump systems for residential homes in Upperville VA. The 1.5 […]

Read more

Bushong Contacting: Edinburg VA Bio-Retention Project

Bushong Contacting: Edinburg VA Bio-Retention Project

Edinburg Mill Streambank & Bio-Retention Project is a stormwater project done for the Town of Edinburg in Virginia. The following were all contributors to the completion of this bio-retention project Bushong Contracting Corporation, Town of Edinburg, Friends of the North Fork of the Shenandoah River, Virginia Department […]

Read more

Bushong Contracting: Demolition and Site Work – Page County Virginia

Bushong Contracting: Demolition and Site Work – Page County Virginia

This is a demolition Project in Luray VA by Bushong Contracting being conducted as a prelude to a new Advanced Auto Store. Demolition Project Overview These pictures are Mindi’s Mexican Restaurant being demolished in Luray Virginia. As a prelude to the new Advance Auto store in Luray […]

Read more

Bushong Contracting: Lorton Landfill Stormwater System – Fairfax Virginia 22079

Bushong Contracting: Lorton Landfill Stormwater System – Fairfax Virginia 22079

Lorton Landfill Stormwater System Project Overview We are back with our second blog for Bushong Contracting! We are going to dive into a stormwater project we completed in April of 2015. This project was outside of the Shenandoah Valley at Lorton Landfill in Fairfax Virginia 22079. We […]

Read more
Copyright © 2019 BUSHONG CONTRACTING CORP. Developed and Maintained By HANS