Douglas Park Excavation You’re looking at a refurbished soccer field done for the City of Winchester at Douglas Park. Overall the Douglas park excavation included 2 practice fields and 1 full size field all supported by a sprinkler system to keep things nice and green. The fields […]
Read more →Front Royal Excavating Project This is a pipeline excavating project installed in Front Royal VA. Work took place mostly at night due to heavy traffic in the main thoroughfare of Front Royal which is Shenandoah Ave and 14th street. Bushong Contracting Installed both 12” and 10” main […]
Read more →This dental office in Winchester VA is one of Bushong Contracting’s 2019 Projects. To learn more about Bushong Contracting you can also visit our website. For an estimate please feel free to email or give us a call. Bushong Contracting 540-459-5975 E: estimating@bushongcontracting.com W: http://www.bushongcontracting.com P:
Read more →This Project is a water treatment tank we excavated for in south of Winchester in Woodstock VA for the Town of Woodstock. We started this project in late 2017 and completed it in early 2018. The project consisted of installing erosion and sediment control, excavating for a […]
Read more →City of Winchester Storm Water Project This was a storm water project for the City of Winchester. The project included the installation of two 20ft storm inlets, a central junction box, corresponding piping, concrete curb and gutter, and pavement patching for the City of Winchester on North […]
Read more →Bushong Contracting provides and array of site and excavation work. Our scope of work expands from sewer and water projects to grading and clearing. This is an installation of approximately 200ft of wastewater line and a secondary vault alongside an existing primary. To learn more about Bushong […]
Read more →Kerfoot Ave Waterline Installation, Front Royal VA We recently have completed a fairly large waterline installation contract for the Town of Front Royal. The work consisted of the replacement of transite water main with ductile iron pipe. Located on Kerfoot Avenue, the replacement ran from the intersection […]
Read more →Willisville Force Main Extension Bushong Contracting was contracted by Loudoun Water to install a sanitary sewer force main. The project required branching off of an existing main with a smaller trunk line in order to install/connect 3 grinder pump systems for residential homes in Upperville VA. The 1.5 […]
Read more →Front Royal 15th Street Excavating Sewer Line Repair Overview: We were contracted with the Town of Front Royal for Excavating Sewer lines around 300 Feet long and up to 15ft deep in order to conduct repairs/replacement. This required considerable layback of the trench for the safety of […]
Read more →Excavating and replacing West 17th Street waterline in Front Royal Virginia Overview As the Contractor we were excavating and replacing one thousand three hundred and fifty (1,350) feet of existing 4” cast iron water main with 6” Class 52 ductile iron pipe on W. 17th Street. This replacement was from […]